Thomas Gleixner 64ca738f1f thermal/x86_pkg_temp: Move work scheduled flag into package struct
Storage for a boolean information whether work is scheduled for a package
is kept in separate allocated storage, which is resized when the number of
detected packages grows.

With the proper locking in place this is a completely pointless exercise
because we can simply stick it into the per package struct.

Signed-off-by: Thomas Gleixner <tglx@linutronix.de>
Tested-by: Srinivas Pandruvada <srinivas.pandruvada@linux.intel.com>
Signed-off-by: Zhang Rui <rui.zhang@intel.com>
2016-11-30 10:25:27 +08:00
..